8 December 2007 work day--preparing for waterfall construction


At the western edge of the property we have to contend with drainage from 2 huge retention ponds. To prevent further erosion and standing water on the trail we are going to construct a waterfall with large flat rocks from within the park stacked upon one another, following the slope uphill. The new waterfall will divert the water to one of 2 retention ponds, then slowly downhill. This photo is of the western trail approaching the waterfall area.